FT2 Installation Instructions. 1) Scale location will need to be laid out. Keeping in mind the scale length plus 10 foot level concrete approaches
4) Weighbridge installation. A. Based on the location of the indicator. Arrange scale so the J-box side of the scale deck is closest to that area
Lower Splice Plate C. Place end module in place first. The section will have bumper bolts on one end and low
G. Set side-to-side bumper blocks into place opposite corners of the scale. H. If needed shift all stands to align the links. If you do
J. Wire the scale into the J-boxes as follows. Metal conduit runs along the outside edge of the scale and from one side to the other. Flexible condui
Section adjust wiring FT2 Truck scales The scale will come with a section adjust box with a board similar to the one pictured below. Main Cable
Summation box wiring FT2 The scale will have a fiberglass J-box mounted on one side of the scale. Located near the center of the scale. (Center of o
K. Install deck cover plates L. Scale is now ready for calibration.
Comments to this Manuals